BOMBARDIER
〰️
BOMBARDIER 〰️





CLIENT
Bombardier
THE CHALLENGE
Installing a high quality booth in the lobby of the Beverly Hills Hotel in the middle of the day is no small task. Keeping it clean and orderly was the name of the game here while the hotel went about their business as usual.
This build was a fairly straight forward project that was showcased at The Milken Institute Global Conference. This meant that we had to be on our best behavior, showcasing our ability to have a seamless and professional installation process that was well managed and executed. In a situation like this, preparation is everything.
Technical Design & Engineering
CNC Machining
Modular Design & Fabrication For Transport and Onsite Assembly
Electrical/Lighting